Farallon Solar Project

Logo riande

  • LOCATION: Farallon, Rio Hato, Cocle, Panama
  • RATED POWER: 4.8 MW
  • PEAK POWER: 5.6 MWp
  • ESTIMATED PRODUCTION (kWh/year):8,160.000 kWh/year
  • CO2 EMISSIONS AVOIDED: 1,632 t/year
  • YEAR OF IMPLEMENTATION:
    Phase 1 November 2015 (960kW)
    Phase 2 December 2016 (960kW)
    Phase 3 January 2018 (2,880kW)